District Mission Statement
About the District
Directions
District Directory
FAQ
General Contacts
Governing Board
Hours & Flex
Ag Permits / CMP
Burning
Burn Permits
Dairy Permitting
Smoke Management System
File a Complaint
Smoking Vehicles
Air Quality Info.
Air Quality Outlook
Daily Forecast
Real-Time Air Quality
Spare the Air Forecast
Wood Burning Forecast
Carbon Monoxide
Emission Inventory
Fast Track Strategy
Ozone Plans
Particulate Matter Plans
Small Business Assistance
Abrasive Blasting
Asbestos
Breakdowns
Bulletins
Burning
Dust Control
Gasoline Dispensing (GDF)
INSPECT Program
Notice of Violation (NOV)
Policies
Record Keeping Forms
Solvent Degreasing
Source Testing
Title V
Training Schedule
Variances
Benefits
Class & Comp
Current Openings
General Info.
Interest Card
Promotional Recruitments
RFPs
Grant & Incentive Programs
Brochures
Budget & Financial
Email Lists
General Documents
Public Records Requests
Subscriptions
CEQA
Guidelines for General Plans
Indirect Source Review
Air Quality Models
Air Quality Mitigation
Transportation
Air Quality Modeling
Air Toxics
Emissions Inventory
Press Releases
Recent News
Valley Air News
Air Toxics
Application Forms
BACT
Dairy Permitting
General Information
PEER
Portable Equipment
Clean Green Yard Machine
Learn About Air
Spare the Air
Wood Burning
Active Indoor Recess
Burn Cleaner / Woodstove
Commute Green Challenge
CSUF Air Quality Class
Clean Green Yard Machine
Environmental Justice
For Kids
Grant & Incentive Programs
Healthy Air Living
Indirect Source Review
Elem. School Curriculum
Request Speaker
Smoking Vehicles
SOON
Spare the Air
Wood Burning
Citizens Advisory Committee
Community Groups
Governing Board
Hearing Board
Symposiums
Town Hall Meetings
Workshops & Hearings
Webcasts
Email Lists
Notices
Outreach Events
Spare the Air
Current Rules
Recent Actions
Rules Main
Rules Under Development

WHAT IS A BREAKDOWN?

An unforeseeable failure or malfunction of equipment, air pollution control equipment, or related operating equipment which causes a violation of any rule, law, permit condition, or emission limitation; or any in-stack continuous emission monitoring (CEM) equipment failure or malfunction.

Back to Top

WHY SHOULD A FACILITY CALL IN A BREAKDOWN?

Because the facility may qualify for relief from enforcement for up to 24 hours or the end of the production run, whichever is sooner.  CEM equipment breakdowns may qualify for up to 96 hours of relief.  If need be, the facility may apply for an emergency variance to give it more time to solve the problem causing the violation.

Back to Top

WHAT DOES A FACILITY HAVE TO DO TO RECEIVE BREAKDOWN RELIEF

  • Notify the District of the breakdown by telephone, fax or email within one hour after its detection.

  • Your notification should include the time, specific location, equipment involved, and the cause of the occurrence (to the extent known)

  • Do not report breakdowns unless a District rule or permit condition will be violated as a result of the breakdown.

  • The breakdown or failure must not be the result of neglect or disregard of any rule or regulation.

  • The breakdown must not be the result of improper maintenance or operator error.

  • The condition cannot create a nuisance.

  • The breakdown or failure must not be of a recurrent nature.

Back to Top

WHO DETERMINES WHETHER OR NOT A BREAKDOWN IS ELIGIBLE FOR RELIEF?

The District will investigate and determine whether the condition constitutes a breakdown.  If it determines that the condition does not constitute a breakdown, the facility will be notified of the denial.  Additionally, the Air Pollution Control Officer may take appropriate enforcement action.

Back to Top

ARE THERE OTHER REQUIREMENTS?

Yes.  The facility must submit a written report within 10 days after a breakdown condition has been corrected.  The report must include:

  • A statement that the condition has been corrected, the date corrected, and proof of compliance.

  • A detailed description of the cause of the breakdown.

  • A description of the corrective measures taken to stop the problem and actions taken to avoid future occurrences.  (Steps must be taken to avoid future occurrences, or breakdown relief may not be granted.)

  • Picture of the equipment that failed, if available.

Back to Top

SHOULD THE FACILITY REQUEST AN EMERGENCY VARIANCE?

If the breakdown is expected to last more than 24 hours (96 hours for CEM equipment) the facility should request an emergency variance prior to the expiration of the breakdown period.

An emergency variance can grant the facility up to 30 days to repair the breakdown and achieve compliance.

Back to Top

For more information about breakdowns please consult District Rule 1100 or the nearest Regional Compliance Office

San Joaquin Valley Unified Air Pollution Control District

4800 Enterprise Way                                 1990 E. Gettysburg                            2700 “M” Street, Suite 275

Modesto CA 95356                                    Fresno, CA  93721                             Bakersfield, CA  93301

(209) 557-6400                                            (559) 230-5950                                  (661) 326-6900

Fax:  (209) 557-6475                                   Fax: (559) 230-6062                          (661) 326-6985

Back to Top